Keywords = | ||
Number of Proceedings: 6 | ||
1 | OPTIMIZATION OF PROJECT TIME-COST TRADE-OFF WITH CONTROLLED CASH FLOWS | |
Mohamed Abo-Zaid; Tamer El-Korany; Emad E. Etman; Salah El-Din F. Taher | ||
Show Article | ||
2 | Finance Based Scheduling Optimization Model for Construction Projects Portfolio Using Enhanced Genetic Algorithm | |
Hesham A. Abdel-khalek; Sherif M. Hafez; Hamada A. Kassem | ||
Show Article | ||
3 | Optimizing Cash Flow of Construction Projects through Material Procurement Plans | |
Mahmoud AbuElnasr; Emad Etman; Haytham Sanad; Mahmoud AbuElnasr; Emad Etman; Haytham Sanad | ||
Show Article | ||
4 | Optimum Cost Design of Reinforced Concrete Beams Using Artificial Bee Colony Algorithm | |
F. A. Abdelmgeed; M. Ghallah; A. Hamoda | ||
Show Article | ||
5 | Productivity and Safety Based Model for Construction Site Layout Optimization | |
Haytham M. Sanad; Mohammad A. Ammar | ||
Show Article | ||
6 | OPTIMIZATION OF HIGH-PERFORMANCE STEEL-CONCRETE COMPOSITE BEAMS CONSIDERING CARBON EMISSIONS | |
Yunyi Deng; Kang Chen; Linzheng Huang; Bo Yang* | ||
Show Article |